


1897 - Page 1
| Date | Tax | Expenditures | |
| AUGUST LEHRMANN | |||
| June 8 | 2 men and team | 4.50 | |
| June 10 | 2 men and team | 3.33 | |
| June 11 | 1 man and team | 2.20 | |
| JOSEPH BENISH | |||
| June 8 | 2 men and team | 4.50 | |
| June 9 | 2 men and team | 4.50 | |
| June 12 | 1 man | .80 | |
| AUGUST PULS | |||
| June 10 | 1 man, team and scraper | 2.50 | |
| FRED STRASSMANN | |||
| June 8 | 2 men, team and plow | 4.69 | |
| June 9 | 2 men, team and scraper | 2.37 | |
| June 11 | 1 man, team and wagon | 3.50 | |
| June 12 | 1 man, team and wagon | 3.50 | |
| June 14 | 1 man, team and wagon | .22 | |
| LORENZ GUZENDA | |||
| June 9 | 1 man | 1.50 | |
| June 10 | 1 man | 1.50 | |
| June 11 | 1 man | 1.34 | |
| June 14 | 1 man | 1.39 | |
| FRED PRESTIEN | |||
| June 5 | 4 men 2 teams 2 wagons | 9.86 | |
| FRANK SEDMEKRADSKY | |||
| June 10 | 1 man 1 team | 3.00 | |
| June 11 | 2 men 1 team 1 wagon | 4.89 | |
| ALBERT WOODWASKER | |||
| June 2 | 1 man, team, plow | 3.25 | |
| June 12 | 1 man, team, wagon | 3.50 | |
| June 14 | 1 man, team, wagon | 2.99 | |
| MARTIN SCHIMMEL | |||
| June 14 | 1 man, team, wagon | 2.65 | |
| WM. PRESTIEN | |||
| June 12 | 1 man | .53 | |
| JOHN MEYER | |||
| June 12 | 1 man, team, wagon | 1.58 |
1897 - Page 2
| Date | Tax | Expenditures | |
| JOHN KOBELSKY | |||
| June 12 | 1 man, team, wagon | 1.40 | |
| WENZEL TOMEK | |||
| June 12 | 1 man, team, wagon | 1.62 | |
| June 12 | 2 man, team, wagon | 5.28 | |
| ADOLPH GRIMM | |||
| August 10 | 2 men, team | 4.50 | |
| August 11 | 2 men, team | 4.17 | |
| FRANK SHAMBERGER | |||
| June 12 | 1 man | 1.50 | |
| June 14 | 2 men, team, wagon | 5.00 | |
| June 15 | 1 man, team, wagon | 2.89 | |
| MARTIN TARDY | |||
| June 9 | 1 man, team, scraper | 3.25 | |
| June 12 | 1 man, team, wagon | 3.50 | |
| June 14 | 1 man, team, wagon | 3.34 | |
| GEORGE SMIDT | |||
| June 8 | 2 men, team, scraper | 4.75 | |
| June 9 | 2 men, team, scraper | 4.75 | |
| June 11 | 1 man, team, wagon | 3.50 | |
| June 12 | 1 man, team, wagon | .20 | |
| GOTTLIEB WIGGER | |||
| June 14 | 1 man, team, wagon | 3.50 | |
| June 15 | 2 men, team, wagon | 5.02 | |
| VALENTINE SOPNEFSKY | |||
| June 11 | 1 man | 1.50 | |
| June 12 | 1 man, team, wagon | 3.50 | |
| June 14 | 1 man, team, wagon | 3.50 | |
| June 15 | 1 man | .88 | |
| AUGUST KLINDER | |||
| June 8 | 2 men, team | 2.25 | |
| June 12 | 1 man, team, wagon | 3.78 | |
| JOHN KOSMOROFSKY | |||
| June 12 | 1 man, team, wagon | 3.50 | |
| June 14 | 1 man, team, wagon | 3.50 | |
| June 15 | 2 men, team, wagon | 4.10 |
1897 - Page 3
| Date | Tax | Expenditures | |
| JOSEPH KRIZEK | |||
| June 14 | 1 man, team, wagon | 3.50 | |
| June 15 | 1 man, team, wagon | 1.50 | |
| June 16 | 1 man | .72 | |
| ANTON KRIZEK | |||
| June 09 | 1 man | 1.50 | |
| ANNA RUBY | |||
| June 09 | 1 man | 1.50 | |
| June 10 | 1 man | 1.50 | |
| June 11 | 1 man | 1.50 | |
| June 12 | 1 man | .72 | |
| FRANK KRIZEK | |||
| June 10 | 1 man, team, scraper | 3.25 | |
| June 15 | 1 man, team, scraper | 3.25 | |
| June 16 | 1 man, team, scraper | .89 | |
| FRANK BUNK | |||
| June 14 | 3 men, 2 team, 2 wagon | 6.25 | |
| OLIVER PELON | |||
| June 18 | 2 men, team, wagon | 5.01 | |
| FRANK KRIZIZKI | |||
| June 16 | 1 man, team, scraper | .75 | |
| June 19 | 2 men, team, scraper | 4.75 | |
| June 21 | 2 men, team, scraper | 1.56 | |
| JOHN ZICK | |||
| June 16 | 1 man | .36 | |
| June 18 | 2 men | 2.50 | |
| June 19 | 2 men | 2.34 | |
| JOSEPH KEOTAH | |||
| June 16 | 2 men, team | 1.00 | |
| June 19 | 2 men, team | 1.52 | |
| JOHN SMIDT | |||
| June 16 | 2 men, team | 1.00 | |
| June 19 | 2 men, team | 1.10 |
1897 - Page 4
| Date | Tax | Expenditures | |
| HERMANN KNICKREHM | |||
| June 12 | 1 man, team, wagon | 3.50 | |
| June 12 | 1 man, team, wagon | 3.50 | |
| June 15 | 1 man | .23 | |
| CHRISTIAN STEIHN | |||
| June 16 | 1 man | .36 | |
| June 19 | 1 man | .48 | |
| WENZEL MAYER | |||
| June 16 | 2 men, team, scraper | 1.00 | |
| June 19 | 2 men, team, scraper | 2.64 | |
| JOHN WISNIFSKY | |||
| June 16 | 2 men, team, plow | 1.00 | |
| June 18 | 2 men, team, plow | 4.75 | |
| June 19 | 2 men, team, plow | 3.75 | |
| JOSEPH RATSACK | |||
| June 18 | 2 men, team | 4.50 | |
| June 19 | 2 men, team | 3.64 | |
| June 14 | 1 man | 1.50 | |
| JOHN GUETSCHOW | |||
| June 12 | 1 man, team, wagon | 1.62 | |
| June 14 | 1 man, team, wagon | 3.50 | |
| June 15 | 1 man, team, wagon | 3.50 | |
| June 16 | 1 man, team, wagon | .91 | |
| GEORGE SCHEPPERT | |||
| June 12 | 2 men, team, wagon | 5.00 | |
| June 14 | 1 man, team, wagon | .27 | |
| W. A. KOCK | |||
| June 11 | 1 man, team, wagon | 3.36 | |
| WM. HERMAN LEHRMANN | |||
| June 10 | 2 men, team, wagon | 4.75 | |
| June 11 | 2 men, team, wagon | 4.73 | |
| B. C. KLINDER |
1897 - 1898 - Page 5
| Date | Tax | Expenditures | |
| B. C. KLINDER | |||
| June 8 | 1 man and scraper | 1.75 | |
| June 9 | 1 man and scraper | 1.50 | |
| June 10 | 1 man and scraper | 1.75 | |
| June 11 | 1 man | 1.50 | |
| June 12 | 1 man | 1.50 | |
| June 14 | 1 man | 1.50 | |
| June 15 | 1 man and scraper | 1.75 | |
| June 16 | 1 man and scraper | 1.62 | |
| June 18 | 1 man and scraper | 1.75 | |
| June 19 | 1 man and scraper | 1.75 | |
| Aug. 10 | scraper | .25 | |
| Aug. 11 | nothing written | .25 | |
| April 22 | for later Post and team | 3.15 | |
| May 30 | for later Post and team | 1.12 | |
| June 1 | for later Post and team | 2.95 | |
| June 4 | for later Post and team | 1.82 | |
| June 8 | for later Post and team | .95 | |
| June 10 | for later Post and team | 1.26 | |
| June 15 | Paid for man and D?? | .75 | |
| July 13 | for laber | .75 | |
| July 26 | for laber and team | 1.50 | |
| Jann. 24 | |||
| Jann. 24 | 1 man and team | 1.80 | |
| Feb. 1 | 1 man | .75 | |
| Feb. 3 | 1 man | .75 | |
| Feb. 5 | 1 man | .75 | |
| Feb. 9 | 1 man | 1.31 | |
| Feb. 22 | 1 man | .75 | |
| ?? 8 | 1 man | .75 | |
| Paid |
1898 - Page 6
| Date | Tax | Expenditures | |
| Two Creeks Accounts | |||
| April 22 | 128 ft. Pind Planks 2 lb. Spikes | 1.58 | |
| May 16 | 354 ft. Pind Planks 5 lb. Spikes | 4.73 | |
| June 10 | 128 ft. Pind Planks 5 lb. Spikes | 1.66 | |
| SCHRADE for ??? | |||
| June 11 | 5 team 30 leads | ||
| June 12 | 11 team 61 leads | ||
| June 14 | 14 team 78 leads | ||
| June 15 | 11 team 31 leads | ||
| July 26 | 1 team 1 lead | 2.01 |
| Date | Text | Remarks |
| April 22 | fixed Colberd by (?) I youse | fixed Culvert by (?) I used |
| the following 125 ft. pindt Planck | the folowing 125 ft. pine Plank | |
| 2 lb Spick team 3 hours | 2 lb Spike, team 3 hours | |
| 1 man 8 hours 1 man 5 hours | 1 man 8 hours, 1 man 5 hours | |
| and 4 Fence Poast | and 4 Fence Post | |
| May 30 | Youse man and team 3 hours for | Used man and team 3 hours for |
| them to get the Planck and Patch | them to get the Plank and Patch | |
| out Colberd youse the Planck | out Culvert, use the Plank | |
| for Drifendt Colberdt | for Different Culvert | |
| June 1 | (?) 2 Colberd on my Road youse | (?) 2 Culvert on my Road, use |
| 128 ft Pind Planck 128 Ceder Planck | 128 ft. Pine Plank, 128 Cedar Plank | |
| and Some Spikes | and Some Spikes | |
| Work 1 man 8 hours 1 man 4 hours | Work 1 man 8 hous, 1 man 4 hours | |
| and the team 2 hours and 8 fence Poast | and the team 2 house and 8 fence Post | |
| June 4 | Had 2 Colberdt on the Corner? of | Had 2 Culvert on the Corner? of |
| Schramm and the town land | Schramm and the town land | |
| and youse the following | and Use the following | |
| 32 ft of Pind Planck | 32 ft. of Pine Plank | |
| 124 ft of Ceder Planck 8 fence Poast | 124 ft. of Cedar Plank, 8 fence Post | |
| and (?) Spikes Work 2 men 4 hours | and (?) Spikes, Work 2 men 4 hours | |
| June 8 | I have a Colberd on the Renline | I have a Culvert on the Renline? |
| By Smidt land youse 96 ft of Pind | By Smidt land, use 96 ft. of Pine | |
| Planck 5 fence Poast and Some Spike | Planck, 5 fence Post and Some Spike | |
| Work for 1 man 4 hours | Work for 1 man 4 hours | |
| June 10 | Got 128 ft of Pind Planck 5 lb | Got 128 ft. of Pine Plank, 5 lb. |
| Spicks from Two Creeks | Spikes from Two Creeks | |
| Work for man and team 3 hours | Work for man and team 3 hours | |
| (?) two Box Colberdt | (?) two Box Culvert | |
| at Guzedda youse the following | at Guzedda, use the following | |
| 128 ft Pind Planck | 128 ft. Pine Plank | |
| 171 ft Ceder Planck and Some Spike | 171 ft. Cedar Plank and Some Spike | |
| Work for 1 man 1 hour | Work for 1 man 1 hour |
| Date | Text | Remarks |
| June 17 | Made a Colberdt on the town lind | Made a Culvert on the town line |
| At Zick land and youse the following | At Zick land and use the following | |
| 64 ft Pind Planck | 64 ft. Pine Plank | |
| 203 ft Ceder Planck 6 fence Poast | 203 ft. Cedar Plank, 6 fence Post | |
| and Some Spicks Work 2 men | and Some Spikes, Work 2 men | |
| 2 hours team 1 hours | 2 hours, team 1 hours | |
| June 18 | Paid for 1 man and Dinnemadt to | Paid for 1 man and Dynamite to |
| Dick out Paid Stunbt 75 cents | Dig out Paid(Dead?) Stump 75 cents | |
| on the town lined by Zick land | on the town line by Zick land | |
| July 13 | Repair Colberdt 1 man 3 hours | Repair Culvert, 1 man 3 hours |
| July 26 | hold 1 hoad of Gravel to the | hauled 1 load of Gravel to the |
| Brage by F. Massmann | Bridge by F. Massmann | |
| and Repaird Colberdt Work for | and Repaired Culvert, Work for | |
| man and team 4 hours | man and team 4 hours | |
| Aug. 10 | Made a Colberdt at Grimm | Made a Culvert at Grimm |
| Youse 64 ft of Pind Planck | Use 64 ft. of Pine Plank |
| Date | Tax | Expenditures | |
| January 28 | For the youse of braking | ||
| Roads through Snow | |||
| Youse my team and man 5 hours | 1.80 | Paid | |
| Mr. TARDY one man 5 hours | .90 | ||
| Mr. WOODWASKA one man 5 hr | .90 | ||
| Febuary 1 | |||
| for the youse of (?) Roads | |||
| for my selve 4 hours | .78 | Paid | |
| Febuary 1 | ADOLPH GRIMM 1-1/2 hours | .27 | |
| Febuary 1 | FRED MASSMANN 6 hours | 1.08 | |
| Febuary 1 | WM. SCHRAMM 6 hours | 1.08 | |
| Febuary 3 | FRED MASSMANN 4 hours | .75 | |
| Febuary 3 | Mr. TARDY 4 hours | .75 | |
| Febuary 3 | Mr. WOODWASKY 4 hours | .75 | |
| Febuary 3 | for My Selve 4 hours | .75 | Paid |
| Febuary 5 | for My Selve 4 hours | .75 | Paid |
| Febuary 5 | Mr. TARDY 4 hours | .75 | |
| Febuary 5 | Mr. SHAMBERGER 4 hours 1 man, 1 team | (smudged) | |
| Febuary 9 | B.C. KLINDER 7 hours | 1.31 | Paid |
| Febuary 9 | AUGUST KLINDER 6-1/2 hours | 1.17 | |
| Febuary 9 | JOHN KOMOROFSKY 6-1/2 hours | 1.17 | |
| Febuary 9 | HERMAN KNICKREHM 5 hours | .90 | |
| Febuary 22 | B.C. KLINDER 4 hours | .75 | Paid |
| Febuary 22 | W.A. KOCK 3-1/2 hours | .65 | |
| Febuary 22 | Mr. SCHAMBERGER 3-1/2 hours man & team | 1.30 |
| Date | Tax | Expenditures | |
| Mar. 8 | For the use of snow. | ||
| Mar. 8 | B.C. KLINDER 4 hrs. | 0.75 | Paid |
| Mar. 8 | GEO. SCHMIDT man and team 3 hrs. | 1.08 | |
| Mar. 8 | W.A. KOCK 3 hrs. | 0.54 | |
| Mr. SCHRAMM 10 hrs. |
| Date | Tax | Expenditures | |
| April 09 | Made a Colberd By | ||
| Joseph Benish youse the | |||
| fulling? 92 ft. Set to Plank | |||
| & Poast and Some Spikes | |||
| Work for 2 men team wagon | |||
| 5 hours for Driffernt Place? | 3.15 | ||
| May 26 | For the youse of geting | ||
| Plancks from Two Creeks | |||
| and peanng? Road | 2.25 | ||
| Youse team and 1 man 6 hours | |||
| 256 ft. plank 5 lbs. spikes | 3.48 | ||
| June 06 | For the use of taking planks | ||
| to the Two River townline and | |||
| for preparing the road, used | |||
| 1 team and man and wagon | |||
| for 4 hrs. | 1.75 | ||
| June 07 | For the use of building | ||
| a Collberd near the | |||
| Two River Rangeline, used | |||
| the foll:- 149 ft. cedar planks, | |||
| 164 ft. pine planks, some spikes | |||
| and 6 fence posts | .60 | ||
| and 1 man 4 hrs. | .75 | ||
| June 23 | For the use of repairing a bridge | ||
| 1 man 2 hrs. | .32 | ||
| July 26 | For Reparing Road | ||
| 1 man & team 4 hours | 1.50 | ||
| Sept. 27 | For Repairing Colberts | ||
| 1 man 2 hrs. | .38 | ||
| Oct. 27 | For Building a Colbert on | ||
| the Beech Tree road used the foll. | |||
| 152 ft. pine planks and some spikes | |||
| 9 lengths cement pipes, 22 1/2 ft in length | |||
| Used 2 men, 1 team and wagon for hauling | |||
| cement pipes & building the colbert | |||
| 33 hrs. | 6.86 |
| Date | Tax | Expenditures | |
| Oct. 27 | Used 48 ft. of our planks | .67 | |
| Nov. 7 | Built a colbert on the section | ||
| road near A. Klinder, for | |||
| which I used the foll. | |||
| 144 ft. of cedar planks, 4 posts | |||
| some spikes. | |||
| 2 mens 4 hrs, and team 1 hr. | 1.68 | ||
| Nov. 29 | Built a colbert near Jos. | ||
| Benish's residence for which | |||
| I used, 116 ft. of cedar planks, | |||
| 3 posts, some spikes. | |||
| 2 men 6 hrs, team 1 hr. | 2.73 |
| Date | Tax | Expenditures | |
| E.D. ADOLPH GRIMM(?) Co. | 8.50 | ||
| for Snow | .27 | ||
| June 17 | 1 man | .52 | |
| June 18 | 2 men team & wagon | 5.00 | |
| June 2? | 1 man team & wagon | 2.71 | |
| FRANK SCHAMBERGER | 9.53 | ||
| for Snow | 2.60 | ||
| June 08 | for Scraper | .25 | |
| June 16 | 1 man team & wagon | 3.50 | |
| June 17 | 1 man team & wagon | 2.98 | |
| MARTIN TARDY | 10.37 | ||
| For Snow | 2.40 | ||
| June 16 | 1 man team & wagon | 3.50 | |
| June 14 | 1 man team & wagon | 3.50 | |
| June 18 | 1 man team & wagon | 0.98 | |
| GEORGE SMITH | 13.06 | ||
| For Snow | 1.08 | ||
| June 16 | 1 man team & wagon | 3.50 | |
| June 17 | 1 man team & wagon | 3.50 | |
| June 18 | 1 man team & wagon | 3.50 | |
| June 20 | 1 man team & wagon | 1.48 | |
| MARTIN SCHIMMEL | 2.80 | ||
| June 17 | 1 man team & wagon | 2.80 | |
| AUGUST LEHRMANN | 10.53 | ||
| June 17 | 1 man team & wagon | 3.50 | |
| June 18 | 2 man team & wagon | 5.00 | |
| June 20 | 1 man team & wagon | 2.03 | |
| WM. PRESTIEN | .60 | ||
| June 20 | 1 man | .60 | |
| JOHN MEYER | 1.65 | ||
| June 17 | 1 man team & wagon | 1.65 | |
| JOHN KOBELSKY | 1.40 | ||
| June 17 | 1 man team & wagon | 1.40 | |
| WENZEL TORNK (?) | 6.81 | ||
| June 20 | 2 men team & wagon | 5.00 | |
| June 21 | 2 men team & wagon | 1.81 |
| Date | Tax | Expenditures | |
| JOS. BENISH | 9.96 | ||
| June 18 | 1 man team & wagon | 3.50 | |
| June 19 | 2 men team & wagon | 5.00 | |
| June 21 | 1 man team & wagon | 1.46 | |
| AUGGUST PULS (sic) | 2.98 | ||
| June 17 | 1 man team & wagon | 2.98 | |
| FRED MASSMANN | 15.04 | ||
| Snow | 1.83 | ||
| June 17 | 2 men team & wagon | 5.00 | |
| June 18 | 2 men team & wagon | 5.00 | |
| June 19 | 1 man team & wagon | 3.21 | |
| FRED PRESTIEN | 11.90 | ||
| June 17 | 1 man team & wagon | 3.50 | |
| June 18 | 1 man team & wagon | 1.75 | |
| June 21 | 1 man team & wagon | 3.50 | |
| June 22 | 1 man team & wagon | 3.15 | |
| HERMANN SCHRAM | 8.75 | ||
| Snow | 3.75 | ||
| June 15 | 2 men team & wagon | 5.00 | |
| FRANK SEDMEHRADSKY | 8.09 | ||
| June 17 | 1 man team & wagon | 3.50 | |
| June 18 | 1 man team & wagon | 3.50 | |
| June 22 | 1 man team & wagon | 1.09 | |
| W.A. KOCK | 3.62 | ||
| Snow | 1.19 | ||
| June 18 | 1 man team & wagon | 2.43 | |
| ALBERT WOODWASKY | 9.46 | ||
| Snow | 1.65 | ||
| June 16 | 1 man team & wagon | 3.50 | |
| June 17 | 1 man team & wagon | 3.50 | |
| June 18 | 1 man team & wagon | .81 | |
| GOTTLIEB WIGGER | 8.77 | ||
| June 16 | 1 man team & wagon | 3.50 | |
| June 17 | 1 man team & wagon | 3.50 | |
| June 18 | 1 man team & wagon | 1.77 |