1907 - 1927 TWO CREEKS ROAD COMMISSIONER LEDGER DISTRICT 3
Years 1907 - 1908

TWO CREEKS TOWNSHIP

[1907-1908]  [ 1909-1910 ]  [ 1911-1912 ]  [ 1913-1914 ]   [ 1915-1916 ]  [ 1917-1918 ]

  [ 1919 ]  [ 1920 ]   [ 1921-1922 ]  [ 1923-1927 ]

[Home ]

Wm. Schmoock Road Commissioner of District No. 3

1907 - Page 1
MonthDayNameTaxExpendituresTotal
June
WM. REDTZLOFF$26.45

June172 team G 6 loads 1 day
$7.00
June182 team G 6 loads 1 day
$7.00
June192 team G 8 loads 1 day
$7.00
June201 team G 4 loads 1 day
$3.50
June21To balance
$1.95


Total

$26.45


PETTER MILLIAN$18.35

June24Gravel 1 team 1 man 4
$3.50
June25Gravel 1 team 1 man 10
$3.50
June26Gravel 1 team 2 men 10
$5.00
June27Gravel 1 team 2 men 10
$5.00
June28To balance
$1.35


Total

$18.35


GEORGE SMITH$25.72



Snow shoveling
$0.50
June24Grating team
$3.50
June254Gravel team 2 men 10 g.
$5.75
June26Gravel team 2 men 10
$5.00
June27Gravel team 2 men 5
$5.00
June28To balance
$5.97


Total

$25.72


JOHN KOCH$14.33



Snow shoveling
$1.10
June241 man 1 day
$1.50
June252 men 1 day
$2.50
Oct.
to balance 18 y. g.
$9.23


Total

$14.33


FRED STRUTZ$13.22

June211 man
$1.50
June211 man
$1.50
June24Gravel 3 y. 1/2 day
$1.75
June28Clay
$3.50
June26to balance
$4.97


Total

$13.22


Total$98.07
$98.07

1907 - Page 2
MonthDayNameTaxExpendituresTotal


HENRY TAYLOR$27.76

June19Team and man Grating
$3.50
June20Gravel & team 20 y.
$7.00
June212 team 2men Grating
$7.00
June221 team 2 men Grating
$3.50
June29To balance
$6.76


Total

$27.76


GEORGE TAYLOR$37.23

June17Grating 6 team man
$3.50
June18Grating 6 team man
$3.50
June19Grating 6 team man
$3.50
June20Gravel 2 Team 4 men 20 y.
$10.00
June21Gravel 2 Team 4 men 20 y.
$10.00
June22To balance
$6.74


Total

$37.2


CHAS. SCHROEDER$6.30

June18Gravel 3 y.
$3.50
June19To balance Scraping
$2.80


Total

$6.30


BEN TAYLOR$29.09

June18Team 2 men Scraping
$5.00
June19Gravel 5 y. 2 men
$7.74
June20Gravel 2 y. 1 man
$4.12
June21Gravel 9 y. 2 men
$7.87
June24To balance 5 men
$4.56


Total

$29.09


FRED JONAS$12.84

Apr.22Grating 2 men team
$5.00
June111 man
$1.50
June171 man
$1.50
June181 man
$1.50
June191 man
$1.50
June20To balance
$1.84


Total

$12.84


Total
$113.23$113.23

1907 - Page 3
MonthTaxNameTaxExpendituresTotal


ADOLPH GRIM$34.65

June17Scraping 2 men 2 team 2 hours
$2.50
June18Scraping 2 men 2 team 1day
$5.00
June152 Hours 2 men 1 team
$1.24
June14Gravel 2 men 6 y.
$7.50
June20Gravel 2 men 8 y.
$7.00
June21Gravel 2 men 6 y.
$5.24
June22To balance 10
$6.17


Total

$34.65


JACK FUNK$3.60

June22Scraping team and man
$3.60


To balance




Total

$3.60


ED GRIM$25.50

June17Gravel team and man 3 y.
$3.50
June18Gravel team and man 4 y.
$3.50
June19Gravel team and man 4 y.
$3.50
June20Gravel team and man 4 y.
$3.50
June21Gravel team and man 4 y.
$3.50
June26To balance 10
$8.00


Total

$25.50


WM. SCHMOOCK$20.71

Mar.30Grating 1/2 day team and man
$1.75
Apr.22Grating 1/2 day team 2 men
$5.00
June101 man
$6.50
June71 man
$1.50
June131 man
$1.50
July2Grating 2 men and tean
$5.00
Nov.22To balance
$4.46


Total

$20.71


WM. SMITH$4.00

June 21Gravel to balance 4
$4.00


To balance




Total

$4.00

1907 - Page 4
MonthDayNameTaxExpendituresTotal


GEORGE BARSCHOW$18.68



Snow Shoveling
$0.75
June3Grating team and 1 man
$3.50
June8Grating team and 1 man
$3.50
June17Grating team and 2 men
$5.00
June18Grating team and 2 men
$5.00
June19To balance.
$0.93


Total

$18.68


ALBERT WODWASHEK$20.06

June17Gravel team and man 3 y.
$3.50
June18Gravel team and man 3 y.
$3.50
June19Gravel team and man 4 y.
$3.50
June20Gravel team and man 4 y.
$3.50
June21Gravel team and man 4 y.
$3.50
June22To balance 3
$2.56


Total

$20.06


GOTTLEAB WIGGER$13.62

June17Gravel team and man 3 y.
$3.50
June18Gravel team and man 3 y.
$3.50
June19Gravel team and man 4 y.
$3.50
June26To balance Scraping
$3.12


Total

$13.62


MARTIN KROMORSKY$26.64

Mar.30Grating team and man 1/2 day
$1.75
June17Gravel team 2 men 4 y.
$6.15
June18Gravel team 2 men 4 y.
$6.15
June19Gravel team 2 men 4 y.
$5.32
June20Scraping team and man
$5.00
June21To balance Scraping
$2.27


Total

$21.64


Total$79.00
$79.00

1907 - Page 5
MonthDayNameTaxExpendituresTotal


AUG. KLINDER$22.87

June27Grating team and 1 man 3
$3.50
June18Gravel team and 1 man 3
$3.50
June19Gravel team and 1 man 4
$3.50
June20Gravel team and 1 man 4
$3.50
June21Gravel team and 1 man 4
$3.50
June22Gravel team and 1 man 4
$3.50
June24To balance 3
$1.87


Total

$22.87


JOE POOTCH$7.20

June22Gravel 4
$4.25
June24To balance Scraping
$2.95


Total

$7.20


JOHN KOMOROSKY$21.60



Grading team and 1 man
$3.50
June21Gravel 4 y
$4.25
June22Gravel 4 y. 2 men
$5.00
June24Scraping team 2 men
$5.00
June25To balance
$3.85


Total

$21.60


JOE KRIZEK$14.97

June25Grating team 2 men
$4.50
June26Grating team 1 men
$3.50
June27Grating team 1 men
$3.50
June29To balance Scraping
$3.47


Total

$14.97


ANTON KRIZEK$14.54

June24Grating team 2 men
$4.50
June26Grating team 1 man
$3.50
June27Grating team 1 man
$3.50
June28To balance Scraping
$3.04


Total

$14.54


WENZEL MEYER$7.20

June20Scraping team 2 men
$5.00
June21Scraping To balance
$2.20


Total

$7.20


Total$88.38
$88.38

1907 - Page 6
MonthDayNameTaxExpendituresTotal


JOE RUBY$13.04

June25Grating team and 1 man
$2.58
June26Grating team and 1 man
$3.50
June27Grating team and 1 man
$1.75
July2Scraping team and 1 man
$3.50
July3Scraping To balance
$1.71


Total

$13.04


ED. GUETSCHOW$16.97

June20Grating team and man
$3.50
June21Gravel team and man 4 y.
$3.50
June22Gravel team and man 2 y.
$1.75
June24Gravel team and man 4 y.
$3.50
Nov.26To balance Grating
$4.72


Total

$16.97
June
FRANK KRITZKY$21.02

June3Grating team and man
$1.86
June8Grating team and man
$3.50
June22Gravel team and man 4 y.
$3.50
June24Gravel team and man 4 y.
$5.00
June25Gravel team and man 4 y.
$5.22
June26To balance Scraping
$1.94


Total

$21.02


JOHN ZICK$14.13

June3Grating team man
$2.75
June8Grating team 2 men
$5.00
June14Grating team 1 man
$0.75
June17Grating team 2 men
$3.00
June18Grating 2 To balance
$2.63


Total

$14.13


JOHN PENZINGER(sic)$7.60

June14Scraping team 2 men
$5.00
June17Scraping To balance
$2.60


Total

$7.60


Total$72.76
$72.76

1907 - Page 7
MonthDayNameTaxExpendituresTotal


GUST EGGERT$28.74

Mar.30Grating team and man
$1.75
June17Grating team and man
$3.50
June18Grating team and man
$3.50
June19Gravel team 2 men 49
$5.00
June20Gravel 2 team 2 men 8
$7.00
June21Gravel 1 team 1 man 4
$3.50
June24Gravel 1 team 1 man 5
$3.50
June25To balance Scraping
$0.99


Total

$28.74


FRANK BARTEL$21.26

June18Team man Gravel 3 y.
$3.50
June19Team man Gravel 3 y.
$3.50
June20Team man Gravel 4 y.
$3.50
June21Team man Gravel 5 y.
$3.50
June22Team man Gravel 4 y.
$3.50
June24Team man To Balance 6 y.
$3.76


Total

$21.26


CHAS. REDTZLAFF$16.03

June14Team man Grating
$3.50
June15Team man Grating
$3.50
June21Team 2 men Scraping
$5.00
June22Team 2 men To balance
$4.65


Total

$16.03


FRANK REDTZLAFF$18.66

June14Team man Grating
$3.50
June15Team man Grating
$3.50
June21Team 2 men Gravel 4 y.
$5.00
June22Team 2 men Gravel 4 y.
$5.00
June24To balance Scraping
$1.66


Total

$18.66


Total$84.69
$84.69

1907 - Page 8
MonthDayNameTaxExpendituresTotal


GEORGE SHEPPERT$21.41

June3Team man Scraping 1/2 day
$1.75
June20Team 2 men Gravel 4 y.
$5.00
June21Team 2 men Scraping
$5.00
June22Team 3 men Gravel 4 y.
$6.50
June24To balance Scraping
$3.16


Total

$21.41


JOHN WISIFSKY$17.40

June20Team 3 men Gravel 4 y.
$6.00
June21Team 3 men Gravel 3 y.
$5.75
June22To balance Scraping
$5.75


Total

$17.40
June
WALTER RIBARCHECK$9.68

June8Man 1/2 day
$0.75
June22Gravel team and man 4 y.
$3.50
June24Gravel team 2 man 4y. To Balance
$5.43


Total

$9.68


EMIL GUETCHOW$16.90

Mar.30Grating 1/2 day team and man
$1.75
Nov.25Grating 1/2 day team 2 man
$5.00
June24Grating 1/2 day team 2 man
$4.55
Nov.16Gravel 4 y.
$3.50
Nov.17To balance 3 y.
$2.16


Total

$16.90


LOUIS FRASCH$18.38

June19Grating team and man
$3.50
June20Gravel team and man 4 y.
$3.50
June21Grating team and man
$3.50
June22Grating team and man
$3.50
June24To balance
$4.38


Total

$18.38

1907 - Page 9
MonthDayNameTaxExpendituresTotal


JOE GOKEY$81.88

June142 men team Grating
$5.00
June152 men team Grating
$5.00
June172 men team Scraping
$5.00
June192 men team Scraping
$5.00
June212 men team Scraping
$5.00
June182 men team Scraping
$5.00
June222 men To balance
$1.88


Total

$31.88


WM. ELLIOT$13.74

June201 man
$1.50
June212 men team Gravel 10 y.
$5.00
June222 men team Gravel 10 y.
$5.00
June242 men To balance
$2.24


Total

$13.74


THOMAS LAHEY$14.86

June21Grating team man
$3.50
June22Grating team man
$3.50
June24Hauling clay 2 men
$5.00
June26hauling clay To balance
$2.86


Total

$14.86


ED. RINGMEIER$21.92



Snow Shoveling
$0.75
June18Scraping team man
$4.00
June19Scraping team man
$4.00
June20Scraping team man
$2.00
June21Scraping team man
$2.00
June22Gravel team man 10 y.
$3.50
June24Scraping To balance
$5.67


Total

$21.92


CHAS. GALLEIN$14.34

June211 man
$1.50
June222 men team Scraping
$5.00
June252 men team Gravel 15 y.
$5.00
June262 men team To balance
$2.84


Total

$14.34


Total$96.74
$96.74

1907 - Page 10
MonthDayNameTaxExpendituresTotal


JOSEPH LAFOND$0.42









HENRY MEANY Total Tax$0.64




$1.06



Gravel from WM. SCHROEDER64 L.



Gravel from CHAS.LACLAIR495





559 Todal






March30Bridge repair by Wishisky
$1.50
March30Bridge repair Rods
north of M. KOMORSKY

$0.25
April12On Town Line by KRIZEK
$1.25
June12Cemment pipe from BEYER
$2.00
June17On Shool(sic) Road
$5.00
June19Cemment pipe from BEYER
$2.00
June20By Wishisky
$2.00
June21By GEORGE TAYLOR
$1.50
June2280 acres South
of LOUIS TRASCH

$1.50
June251 mile West of ED GRIM
$1.50
Sept.8On Shool Road
$7.20
Sept.1310 Rods West of
FRANK BARTAL

$1.00
Sept.20By ANTON KRIZEK
$1.75
Sept.27By JOHN KOCH
$0.50


Total
$22.00


4 ceter Post. 40 ct Spikes 10 ct.
$0.50


Total
$22.50

1907 - Page 11
MonthDayNameExpenditures


Over Work
June31 day$1.50
June81 day$1.50
June141 day$1.50
June171 day$1.50
June181 day$1.50
June191 day$1.50
June201 day$1.50
June211 day$1.50
June221 day$1.50
June241 day$1.50
June251 day$1.50
June261 day$1.50


Total$18.00


Snow Shoveling from 1907 &/1908


JOE GOKEY$5.00


FRANK BARTAL$0.75


JOHN ZICK$3.00


GUST EGGERT$0.75


JOHN KOCH$5.00


CHAS. LACLAIR$2.16


JOE KIRZECK$3.00


LOUIS FRASCH$1.50


Total$21.16






WM SCHMOOCK Snowing Shoveling


for 1907 and 1908


2 days$3.00


Total$3.00






Settlement made in full this 31st day


of March 1908.


HENRY LEHRAMANN


ROBT SCHROEDER


Town Board of Audit

WILLIAM SCHMOOCK ROAD COMMISSION DIST. 3 - 1908
1908 - Page 12
MonthDayNameTaxExpendituresTotal


WM. REDTZLAFF SR.
$14.39
April111/2 day grating$1.75

April181/2 day grating$1.75

June10Grating$4.00

June111/2 day grating Gravel 2$3.50

June12To balance Gravel 5$3.39



Total

$14.39


WM. REDTZLAFF JR.
$5.52
June10Grating day$3.50

June11To balance Gravel $2.02



Total

$5.52


ANTON HALLA$17.41$17.41
June17Grating team 2 men$5.00

June18Grating team 2 men$5.00

June19Halling clay$5.00

June20To balance clay$2.41



Total

$17.41


GEO. SCHMITD(sic)
$20.46
June15Gravel 8 y.$3.50

June16Gravel 8 y. 2 men$5.00

June17Gravel 6 y. 2 man$5.00

June18Gravel 5 y. 2 men$5.00

June19To balance Clay$1.46



Total

$20.46


JOHN KOCH
$11.46
June
Snow Shoveling$5.00

June17Grating 1/2 day$1.75

June18Grating 1 day$3.50

June19To balance Clay$1.21



Total

$11.46


FRED STRUTZ
$10.84
June131 man$1.50

June19Hauling Clay$3.00

June20To balance clay$2.34



Snow Shoveling$3.00



Total

$10.84


Total
$79.58 $79.58

1908 - Page 13
MonthDayNameTaxExpendituresTotal


HENRY TAYLOR$19.61

June15Gravel 4 y.
$5.50
June16Gravel 3 y.
$4.50
June17Gravel 4 y.
$5.00
June18To balance 4 Y.
$4.61


Total

$19.61


GEORGE TAYLOR$28.26

June15Gravel 4 y.
$4.00
June16Gravel 4 y. 2 men
$5.50
June17Gravel 4 y. 2 men
$5.00
June18Gravel 4 y. 2 men
$5.00
June19Gravel 3 y. 1 man
$3.25
June20To balance 4 y. 2 men
$5.51


Total

$28.26


CHAS SCHRODER$4.73

June13Gravel 4 y.
$3.50
June14Gravel To balance 1 y.
$1.23


Total

$4.73


BEN TAYLOR$23.79

June13Gravel 4 y. 2 men
$5.50
June14Gravel 4 y. 2 men
$5.50
June16Gravel 8 y. 1 man
$3.00
June17Gravel 8 y. 2 men
$7.00
June18Gravel To balance 3 y. 2 men
$2.79


Total

$23.79


ADOLPH GRIMM$27.49

June12Scraping
$2.50
June13Scraping
$5.00
June15Gravel 4 y.
$4.00
June16Gravel 2 y. and Scraping
$5.00
June17Gravel 12
$8.40
June19Gravel 4 To balance
$2.59


Total

$27.49


Total$103.88
$103.88

1908 - Page 14
MonthDayNameTaxExpendituresTotal


FRED JONAS$9.57

June10Grating 1 day 2 men
$5.00
Nov.25Hauling Stones ?? line
$2.82


To balance Grating
$1.75


Total

$9.57


ED GRIMM$20.04

June12Gravel 1/2 day 3 y.
$2.10
June13Gravel 1/2 day 4 y.
$2.80
June15Gravel 1/2 day 5 y.
$3.50
June16Gravel 1/2 day 5 y.
$3.50
June17Gravel 1/2 day 3 y.
$2.61
June18To balance 8
$5.53


Total

$20.04


WM. SCHMOOCK$16.03

Apr.112 men team 1/2 day Grating
$2.50
Apr.132 men team 1/2 day Grating
$2.50
June151 man 1/2 day
$0.75
June171 man 1 day
$1.50
June9Taking Grate
to blacksmith

$1.75
June25Grating 2 men team
$5.00
June
Breacking Roads in Winter
$1.75
Nov.30To balance cuting trunck
$0.28


Total

$16.03
June
GEO. BARSCHOW$14.16

June111/2 day Gravel 2 y.
$1.75
June121 day Gravel 5
$3.50
June131 day Gravel 5
$3.50
June151/2 day Gravel 3 y.
$2.70


To balance Gravel
$3.31


Total

$14.16


Total$59.80
$59.80

1908 - Page 15
MonthDayNameTaxExpendituresTotal


ALBERT WODWASKEK$12.23

June111/2 day 1 man
$0.75
June121 day 1 man
$1.50
June131 day 1 man
$1.50
June151/2 day 1 man
$0.75
June16Gravel 4 y. 2 men
$5.00
June17To balance 4 y. 2 men
$2.73


Total

$12.23


MARTIN KOMORSKY$20.50

Apr.111/2 day Grating
$1.75
Apr.131/2 day Grating
$1.75
June122 men team Gravel 8
$5.00
June132 men team Gravel 5
$5.00
June152 men team Gravel 5
$5.00
June16To balance Gravel 2
$2.10


Total

$20.50


GOTTLIEB WIGGERT$10.58

June19Scrapin 2 men
$4.50
June20Scraping 2 men
$4.50
June22To balance
$1.58


Total

$10.58


AUG. KLINDER$18.23

June12Gravel 4 y.
$3.50
June13Gravel 5 y.
$3.50
June15Gravel 5 y.
$3.50
June16Gravel 4 y.
$2.80
July1Scraping 2 men
$4.73


Total

$18.23


JOHN KOMOROSKY$17.13

June12Gravel 4 y.
$3.50
June13Gravel 4 y.
$3.50
June16Gravel 4 y.
$4.00
June30Scraping To balance
$6.13


Total

$17.13


Total$78.67
$78.67

1908 - Page 16
MonthDayNameTaxExpendituresTotal


JOE KRIZEK$11.67

June19Scraping team and man
$3.00
June20Scraping team and man
$3.00
June22Scraping team and man
$3.00
June23To balance
$1.17


Snow Shoveling
$1.50


Total

$11.67
June
ANTON KRIZEK$11.56

June22Scraping 2 men team
$4.50
June23Scraping 2 men team
$2.92
June26To balance 2 men team
$4.14


Total

$11.56


JOE RUBY$10.02

June171/2 day 1 man
$0.75
June22Scraping team and Scraper
$3.50
June23Scraping team and Scraper
$5.50
June25Scraping To balance
$2.27


Total

$10.02


ED GUETSCHOW$13.24

June13Gravel 4 y.
$4.00
June17Gravel 4 y.
$2.75
June18Gravel 2 y.
$1.00
June19Gravel 2 y.
$1.75
Nov.13Gravel 2 y.
$1.74


Grating To balance
$2.00


Total

$13.24


FRANK KIRZIZKE$16.14

June11Grating 1/2 day
$1.75


Snow Shoveling
$.55
June12Grating 1 day
$3.50
June13Grating 1 day
$3.50
June151 man
$1.50
June16Gravel 2 y.
$3.50
June17To balance 2 y.
$1.69


Total

$16.19


Total$62.68
$62.68

1908 - Page 17
MonthDayNameTaxExpendituresTotal


JOHN ZIK$14.06



Snow Shoveling
$3.00
June10Grating 1 man
$1.50
Oct.14Scraping 2 men and 1 team
$5.00
Nov.9Gravel 6 y To balance
$4.56


Total

$14.06


JACOB FUNK$2.70

June13Scraping team and
men to balance

$2.70


Total

$2.70


WM. SCHMIDT$3.00

June23Gravel to balance
$3.00


Total

$3.00


JOSEPH PUTA$5.40

June15Gravel 4 y. to balance
$5.40


Total

$5.40


WENZEL MEYER$5.40

June23Scraping To balance
$5.40


Total

$5.40


JOHN BENZINGER$5.70

June23Scraping team 2 men
$5.00
June25To balance
$0.70


Total

$5.70


GUST EGGERT Total Tax$22.31



Snow Shoveling
$0.75
June15Gravel 4 y.
$4.00
June16Gravel 4 y.
$4.75
June17Gravel 5 y. 2 men
$6.10
June18Gravel 3y. 2 men
$4.36
June19Gravel To balance
$2.35


Total

$22.31


WALTER RIBARCHECK$7.86

June17Gravel 1 y.
$2.75
June18Gravel 5 y. To balance
$5.11


Total

$7.86


Total
$66.43$66.43

1908 - Page 18
MonthDayNameTaxExpendituresTotal


FRANK BARTEL$16.15



Snow Shoveling
$0.75
June16Gravel 4 y.
$4.00
June17Gravel 4 y.
$3.50
June18Gravel 4 y.
$3.50
June19Gravel 2 y.
$1.75
June25Grating To balance
$2.65


Total

$16.15


CARL RETZLAFF$12.34

June19Scraping 3 men 2 team
$7.10
June20Scraping 2 men 2 team
To balance

$5.24


Total

$12.34


FRANK RETZLAFF$13.16

June13Gravel 4 y.
$4.00
June16Gravel 2 y. 2 men
$2.75
June17Gravel 4 y. 2 men
$5.00
June18Gravel 2 y. To balance
$1.41


Total

$13.16


GEO. SHEPERT$16.50

June111/2 day Grating
$1.75
June12Grating
$3.50
June13Grating 2 men
$5.00
June16Grating Gravel 1 y.
$4.00
June17To balance Gravel 3
$2.25


Total

$16.50


JOHN WISNIFSKY$12.90

Nov.11Gravel 8
$7.00
Nov.12Gravel 5
$4.95
Nov.13Gravel 1 To balance
$0.95


Total

$12.90


Total$71.05
$71.05

1908 - Page 19
MonthDayNameTaxExpendituresTotal


EMIL GUETSCHOW$13.95

June11Grating 2 men team
$5.00
June12Grating 2 men team
$5.00
June13Grating To balance
$3.95


Total

$13.95


LOUIS FRASCH$14.34



Snow Shoveling
$1.50
July
2 team 3 men Grating
$8.50
Nov.
Hauling Clay To balance
$4.34


Total

$14.34


JOE GOKEY$24.53



Snow Shoveling
$5.00
June19Gravel 10 y. 2 team
$7.00
June20Gravel 10 y. 2 team
$7.00
June22Gravel 10 To balance
$5.53


Total

$24.53


ELLA R. LAHEY$6.89

July
Team Grating
$3.50
Oct.
Hauling Clay To balance
$3.39


Total

$6.89


MARTIN LAHEY$5.75

Oct.
Hauling clay
$3.50
Oct.
Hauling clay To balance
$2.25


Total

$5.75


WM. ELLIOTT$11.84

June17man
$1.50
June181 man
$1.50
June191 man
$1.50
June201 man
$1.50


Hauling clay
$3.50


Hauling clay To balance
$2.34


Total

$11.84


Total$77.30
$77.30

1908 - Page 20
MonthDayNameTaxExpendituresTotal


ED RINGERMEYER$16.89

June13Gravel 4 L.
$4.00
June15Gravel 4 L.
$4.00


Scraper 6 days
$3.00
June16Gravel 4 L.
$4.00
June17Gravel 2 To balance
$1.89


Total

$16.89


CHAS. LACLAIR$10.90



Snow Shoveling
$2.16
June12Scraping 2 men team
$5.00
June20Scraping 2 men team To balance
$3.74


Total

$10.90


JOE. LA FOND$0.32









HENRY MEANY$0.48









Total$27.59
$27.79








Gravel from CHAS. LACLAIR353 L.



Road Scraper from




JOHN RUTHER 5 days$2.50

1908 - Page 21
MonthDayNameExpenditures


Over Work
June10Over Work$1.50
June11Over Work$1.50
June12Over Work$1.50
June13Over Work$1.50
June15Over Work$1.50
June16Over Work$1.50
June17Over Work$1.50
June18Over Work$1.50
June19Over Work$1.50
June20Over Work$1.50
June22Over Work$1.50
June23Over Work$1.50


Total$18.00




Apr.8Bridge Repair Lake Shore
& Places and
School Road
$1.75
May20Bridge Repair 40 Rods
North from G. SMITH
$1.00
May21Bridge Repair 40 Acres
North from MR. KOMOROSKY
$0.25
June15Bridge Repair 80 Acres
North from G. SMITH
$2.00
June13Getting Pipes$2.00
June16Getting Pipes$2.00
June17Bridge Repair 10 Rods
North from FRED STRUTZ
$2.00
June18By ADOLPH GRIMM$0.45
June23By JOE GOKEY$1.25
June231 Mile West
from ED GRIMM
$0.7
June231/2 Mile West
from WM. SCHRAMM
$0.7
June2440 Acres North
from WM. KOMOROSKY
$3.50
Aug.25By JOHN ZIK$1.50
Sept.780 rods North
from G. SMITH
$0.50
Sept.9By GEORGE SMITH$3.50
Nov.25On School Road 25 Piel. 5 y. ch$0.75






Spikes$0.40


Total$24.15


Settlement made in full with
WM. SCHMOOCK



Road Commissioner
Dist. No 3.
Dated this 1st day
of 4 Dec. 1908.



AUG. ????


ROBT SCHROEDER


IGNATZ WOJTA


Town Board

1908 - Page 22
NameExpenditures
Snow Shoveling for 1908 and 1909
JOE KRIZEK$2.00
ANTON KRIZEK$1.00
JOHN ZICK$2.00
FRANK BARTEL$0.75
ADOLPH GRIMM$0.75
GUST EGGERT$1.50
JOE GOKEY$2.00
CHAS. RETZLAFF$2.50
GEO. TAYLOR$0.75
ED. RINGMIER$0.75
LOUIS FRASCH$1.50
CHAS. LACLAIR$1.50
FRED STRUTZ$0.75
TOM LAHEY$0.75
JOHN KOCH$0.75
ALBERT GERDTZ$2.00
ANTON HALLA$2.00
FRED JONAS$0.75
GEO. BARSHOW$0.60
GEOR. SHERPERT$0.75
WM. SCHMOOCK$1.75
Total$27.10
WM SCHMOOCK Road
Commission D. No. 3 Back
$1.50