

[1907-1908] [ 1909-1910 ] [ 1911-1912 ] [ 1913-1914 ] [ 1915-1916 ] [ 1917-1918 ]

1913 - Page 73
| Month | Day | Name | Tax | Expenditures | Total |
| WM. RETZLAFF | $6.15 | ||||
| June | 2 | 1 man 1 team 1 day Ground | $3.50 | ||
| June | 13 | man team balance | $2.65 | ||
| Total | $6.15 | ||||
| ANTON HALLA | $16.26 | ||||
| Snow Shoveling | $1.00 | ||||
| June | 14 | 1 man 1 team 1/2 day Scraping | $1.75 | ||
| June | 16 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 17 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 18 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 19 | 1 man Balance | $3.01 | ||
| Total | $16.26 | ||||
| ALBERT GEERDTS | $22.16 | ||||
| Snow Schoveling | $0.50 | ||||
| June | 13 | 1 man 1 team 1/2 day Grating | $1.75 | ||
| June | 14 | 1 man 1 team 1 day Grating | $3.50 | ||
| June | 16 | 2 men 2 team Gravel 1 day | $7.00 | ||
| June | 17 | 2 men 2 team l day | $7.00 | ||
| June | 18 | 1 man 1 team at Balance | $2.41 | ||
| Total | $22.16 | ||||
| JOHN KOCH | $10.61 | ||||
| June | Snow Schoveling | $0.20 | |||
| June | 17 | 1 man 1 team 1 day | $3.50 | ||
| June | 18 | 1 man 1 team 1 day | $3.50 | ||
| June | 19 | 1 man 1 team 1 day at balance | $3.41 | ||
| Total | $10.61 | ||||
| FRED STRUTZ | $9.48 | ||||
| May | 29 | 1 man 1 team 1 day Scraping | $4.00 | ||
| May | 31 | 1 man 1 team 1 day Scraping | $4.00 | ||
| June | 16 | 1 man 1 day Schoveling Gr. | $1.48 | ||
| Total | $9.48 | ||||
| Total | $64.66 | $64.66 |
1913 - Page 74
| Month | Day | Name | Tax | Expenditures | Total |
| HENRY TAYLOR | $20.30 | ||||
| Scrap. 1 day 1/2 | $0.30 | ||||
| June | 11 | 2 men 1 team 1 day Gravel | $5.00 | ||
| June | 12 | 2 men 1 team 1 day | $5.00 | ||
| June | 13 | 2 men 1 team 1 day | $5.00 | ||
| June | 18 | 2 men 1 team holing Clay at balance | $5.00 | ||
| Total | $20.30 | ||||
| GEORGE TAYER | $29.41 | ||||
| June | 11 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 14 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 16 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 17 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 18 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 19 | 1 man 1 team 1 day Grating | $3.50 | ||
| June | 27 | at balance 2 Load Gravel | $1.41 | ||
| Total | 29.4 | ||||
| CHAS. SCHROEDER | $5.70 | ||||
| June | 13 | 1 man 1 team 1/2 day Gravel | $1.75 | ||
| June | 14 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 16 | 1 man To balance 1 Load Gravel | $0.45 | ||
| Total | $5.70 | ||||
| FRANK RETZLAFF JR | $11.46 | ||||
| June | 11 | 1 man 1 team Hauling Pling and work on B | $2.50 | ||
| June | 13 | 1 man 1 team Hauling Gravel | $3.50 | ||
| June | 14 | 2 men 2 team Gravel to balance | $5.46 | ||
| Total | $11.46 | ||||
| Total | $66.87 | $66.87 |
1913 - Page 75
| Month | Day | Name | Tax | Expenditures | Total |
| HERMAN MEYER | $23.32 | ||||
| June | 11 | 1 man 1 team 1 day | $3.50 | ||
| June | 12 | 1 man 1 team 1 day | $3.50 | ||
| June | 13 | 1 man 1 team day Scraping Gravel | $4.00 | ||
| June | 14 | 1 man 1 team hauling | $3.50 | ||
| June | 16 | 1 man 1 team hauling | $3.50 | ||
| June | 17 | 1 man 1 team hauling | $3.50 | ||
| June | 18 | 1 man 1 team to balance | $1.82 | ||
| Total | $23.32 | ||||
| June | FRED JONAS | $12.97 | |||
| June | 11 | 1 man work on Brige 10 hours | $2.00 | ||
| June | 12 | 2 men 1 team 1/2 day on Brige | $2.50 | ||
| June | 16 | 2 men 1 team 1 day Scraping | $5.50 | ||
| June | 24 | 1 man 1 team to balance | $2.97 | ||
| Total | $12.97 | ||||
| ADOLPH GRIMM | $27.03 | ||||
| June | 9 | 2 men two team 1/2 day Gravel | $3.50 | ||
| June | 10 | 2 men two team 1 day | $7.00 | ||
| June | 11 | 1 men on Brige 10 hours | $4.00 | ||
| June | 12 | 1 men two team 1 day Gravel | $7.00 | ||
| June | 13 | 2 men 2 team to balance | $5.53 | ||
| Total | $27.03 | ||||
| ERNST DUVINK | $21.88 | ||||
| June | 11 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 13 | 2 men to team Gravel | $7.00 | ||
| June | 14 | 2 men to team | $7.00 | ||
| June | to balance on Bridge | $0.88 | |||
| Total | $21.88 | ||||
| Total | $85.20 | $85.20 |
1913 - Page 76
| Month | Day | Name | Tax | Expenditures | Total |
| FRANK RIHA | $12.90 | ||||
| June | 12 | 1 man 1 day 10 hours on Brige | $2.00 | ||
| June | 18 | 1 man 1 day 1 day | $1.50 | ||
| June | 19 | 1 man 1 team 1 day | $3.00 | ||
| June | 29 | 1 man 1 team 1 day | $3.00 | ||
| Oct. | 22 | 1 man Scraping 1 Ld Gravel | $3.40 | ||
| Total | $12.90 | ||||
| ALBERT WODWASHEK | $13.20 | ||||
| May | 31 | 1 man 1 team 1/2 day Grading | $1.75 | ||
| June | 9 | 2 men 1 team 1 day Grading | $5.00 | ||
| June | 10 | 2 men 1 team 1 day Grading | $5.00 | ||
| June | 11 | 1 man 1 day to balance | $1.45 | ||
| Total | $13.20 | ||||
| MARTIN KORMORSKY | $34.30 | ||||
| June | 9 | 1 man 1 team 1 day Grading | $3.50 | ||
| June | 10 | 1 man 1 team 1 day Grading | $3.50 | ||
| June | 11 | halt 11 Barll Cement | $3.00 | ||
| June | 12 | 3 man 2 team 1 day Gravel | $8.50 | ||
| June | 13 | 3 man 2 team 1 day Gravel | $8.50 | ||
| June | 14 | 3 man 2 team 1 day to Balince | $7.30 | ||
| Total | $34.3 | ||||
| AUGUST KLINDER | $16.17 | ||||
| June | 11 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 14 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 24 | 3 Lod of Gravel to balince | $2.17 | ||
| Total | $16.17 | ||||
| JOSEPH KRIZEK | $11.36 | ||||
| Snow Shoveling | $0.30 | ||||
| June | 10 | 1 man 1 team 1 day Grading | $3.50 | ||
| June | 11 | 1 man 1 team 1 day Grading | $3.50 | ||
| June | 13 | 3 Lod of Gravel | $3.00 | ||
| June | 14 | to balnce 1 Lod Gravel | $1.06 | ||
| Total | $11.36 | ||||
| Total | $87.93 | $87.93 |
1913 - Page 77
| Month | Day | Name | Tax | Expenditures | Total |
| ANTON KRIZEK | $10.04 | ||||
| June | 12 | 1 man 1 team 2 Load Gravel | $2.00 | ||
| June | 13 | 1 man 1 team 3 Load Gravel | $3.10 | ||
| June | 14 | 1 man 1 team 3 Load | $3.00 | ||
| June | 16 | 1 man 1 team 2 to balnce | $2.04 | ||
| Total | $10.04 | ||||
| ANTON KRIZEK | $8.51 | ||||
| June | 18 | From 1912. Lod 3 | $3.00 | ||
| June | 16 | 1 man Load 1 | $1.00 | ||
| June | 17 | 1 man Load 3 | $3.00 | ||
| June | 19 | 1 man to balnice | $1.51 | ||
| Total | $8.51 | ||||
| AUGST LAST | $4.50 | ||||
| Aug. | 2 | hole 6 Lod of Gravel | $4.50 | ||
| WILLIAM SCHRAMM | $4.50 | ||||
| June | 16 | 4 Lod of Gravel part of day Scraping | $4.50 | ||
| EDWARD GUETSCHOW | $14.35 | ||||
| June | 10 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 11 | 2 man 1 team 1 day Gravel | $4.25 | ||
| June | 12 | 2 man 1 team 1 day Gravel | $5.00 | ||
| June | 13 | 1 man 1 day on Bridge | $1.60 | ||
| Total | $14.35 | ||||
| FRANK KRIZIZKE | $18.84 | ||||
| Apr. | 4 | 1 man 1/2 day | $0.75 | ||
| Apr. | 12 | 1 man 1/2 day | $0.75 | ||
| June | 10 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 11 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 12 | 2 man 2 team 1 day Gravel | $7.00 | ||
| June | 13 | 1 man 1 team 1/2 day | $1.75 | ||
| Oct. | 18 | hol 6.65 feet of plink | $1.59 | ||
| Total | $18.84 | ||||
| Total | $52.23 | $52.23 |
1913 - Page 78
| Month | Day | Name | Tax | Expenditures | Total |
| JOE ZIK | $16.96 | ||||
| Apr. | 15 | 1 man 1 team 1 day Grading | $3.50 | ||
| Apr. | 16 | 1 man 1 day Grading | $2.00 | ||
| Nov. | 24 | 1 man 1 team 1/2 day Grading | $1.75 | ||
| Nov. | 26 | man team 3/4 day Grading | $3.00 | ||
| Nov. | 28 | man team 1 day repairing B | $3.50 | ||
| Nov. | 29 | man tem To Balnice | $3.21 | ||
| Total | $16.96 | ||||
| JACOB FUNK | $3.30 | ||||
| June | 11 | 1 man 1 team 1 day Gravel | $3.30 | ||
| WM. SCHMIDT | $3.60 | ||||
| June | 21 | 2 man 1 team Scring on Bridge | $3.60 | ||
| EMIL PUTA | $2.70 | ||||
| June | 12 | 1 man 1 day on Bridge | $1.50 | ||
| June | 13 | 1 man 1 day on Bridge | $1.20 | ||
| Total | $2.70 | ||||
| AUGUST PUTA | $3.30 | ||||
| June | 9 | 1 man 1 team 1 day Grading | $3.30 | ||
| WENZEL MEYER | $7.50 | ||||
| Oct. | 11 | 1 man 1 team 1 day JOHN KRIZIZKE | $3.50 | ||
| Nov. | 24 | 1 man 1 team 1/2 day Grading ED RETZLAFF | $1.75 | ||
| Nov. | 28 | 1 man 1 team to Balnice | $2.25 | ||
| Total | $7.50 | ||||
| JOHN BENZINGER | $8.40 | ||||
| June | 10 | 1 man 1 team Scraping | $3.40 | ||
| June | 11 | 2 men 1 team 1 day Scraping | $5.00 | ||
| Total | $8.40 | ||||
| June | 18 | FRANK LECLAIR Gravel | $0.14 | $0.14 | |
| Apr. | 4 | WM. KLINDER repairing B | $0.36 | $0.36 | |
| June | 17 | EMIL RETZLAFF | $0.15 | $0.15 | |
| Sept. | 5 | RUDOLPH HALLADA on B | $1.36 | $1.36 | |
| Total | $47.77 | $47.77 |
1913 - Page 79
| Month | Day | Name | Tax | Expenditures | Total |
| GUST EGGERT | $23.33 | ||||
| June | 10 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 11 | 2 men 1 team cement on B | $5.00 | ||
| June | 12 | 2 men 2 team | $7.00 | ||
| June | 13 | 2 men 2 team Gravel | $7.00 | ||
| June | 14 | 1 man 1 team Grading | $0.83 | ||
| Total | $23.33 | ||||
| FRANK BARTAL | $17.14 | ||||
| June | 10 | 1 man 1 team 2 load G | $2.00 | ||
| June | 11 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 14 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 16 | 1 man to balince | $1.14 | ||
| Total | $17.14 | ||||
| CHAS. RETZLAFF | $15.06 | ||||
| June | 10 | Snow Shoveling | $0.75 | ||
| June | 10 | 2 man 1 team 1 day Gravel | $5.00 | ||
| June | 11 | 2 man 1 team 1 day Gravel | $5.00 | ||
| June | 12 | 1 man 1 team Gravel | $3.50 | ||
| June | 13 | 1 man to balance on B | $0.81 | ||
| Total | $15.06 | ||||
| MRS. FRANK RETZLAFF | $15.95 | ||||
| June | 10 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 11 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 13 | 1 man on Bridge day | $1.00 | ||
| June | 14 | 1 man 1 team 1/2 day Gravel | $1.75 | ||
| June | 17 | 1 man 1 team to Balinice | $2.70 | ||
| Total | $15.95 | ||||
| GEO. SHEPPER | $15.84 | ||||
| June | 10 | 3 man 2 team 1 day Gravel | $8.50 | ||
| June | 11 | 2 man 2 team 1 day Gravel | $5.84 | ||
| June | 12 | 1 man 1 day on Bridge | $1.50 | ||
| Total | $15.84 | ||||
| Total | $87.32 | $87.32 |
1913 - Page 80
| Month | Day | Name | Tax | Expenditures | Total |
| JOHN KRIZIZKE | $14.54 | ||||
| April | 16 | 1 man 1 team 1/2 day Grading | $1.34 | ||
| June | 11 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 team 1/2 day Gravel | $1.70 | ||
| June | 24 | 1 man 1 team 1 day Gravel | $3.50 | ||
| June | 26 | To balnce on Bridge | $1.00 | ||
| Total | $14.54 | ||||
| JOHN KOMRSKI | $21.50 | ||||
| Apr. | 2 | 1/2 day on Bridge | $0.75 | ||
| Apr. | 16 | 1 man 1 team 1 day Grading | $3.50 | ||
| June | 10 | 2 man 1 team 1 day Gravel | $4.75 | ||
| June | 11 | 2 man 1 team 1 day Gravel | $5.00 | ||
| June | 13 | 2 man 1 team 1 day Gravel | $5.00 | ||
| June | 24 | 2 men, 1 team 1/2 day Scraping | $2.50 | ||
| Total | $21.50 | ||||
| PETER WISNEFSKY | $16.27 | ||||
| Apr. | 16 | 1 man 1 team 1 day Grading | $3.50 | ||
| June | 10 | 2 man 2 team 1 day Gravel | $7.00 | ||
| June | 11 | 1 man 2 team to Balnce Gravel | $5.77 | ||
| Total | $16.27 | ||||
| LOUIS FRASH | $15.44 | ||||
| June | 18 | 2 man 1 team 1 day Gravel | $5.00 | ||
| June | 19 | 2 man 1 team 1 day Clay | $5.00 | ||
| June | 24 | 2 man 1 team 1 day Clay | $5.00 | ||
| June | 26 | To Balnise Gravel | $0.44 | ||
| Total | $15.44 | ||||
| GEO. GOKEY | $13.87 | ||||
| June | 19 | 2 man 1 team 1 day Grading | $5.00 | ||
| Snow shoveling | $0.15 | ||||
| June | 24 | 1 man 1 team 1 day Caly | $3.50 | ||
| June | 26 | 1 man 1 team 1 day Caly | $3.50 | ||
| June | 27 | 1 man 1 team To Balince | $1.72 | ||
| Total | $13.87 | ||||
| Total | $81.62 | $81.62 |
1913 - Page 81
| Month | Day | Name | Tax | Expenditures | Total |
| PETER DOSE | $16.90 | ||||
| Snow Shoveling | $0.50 | ||||
| June | 18 | 2 men 1 team 1 day Clay | $5.00 | ||
| June | 19 | 2 men 1 team 1 day Clay | $5.00 | ||
| June | 24 | 2 men 1 team 1 day Gravel | $5.00 | ||
| June | 26 | 1 man 1 team To balinice | $1.40 | ||
| Total | $16.90 | ||||
| CHAS. LECLAIR | $31.31 | ||||
| June | 12 | 1 man 1 day Gravel | $1.50 | ||
| June | 13 | 1 man 1 day Gravel | $1.50 | ||
| June | 18 | 2 men 1 team 1 day | $5.00 | ||
| June | 19 | 3 men 2 team 1 day | $8.50 | ||
| June | 24 | 3 men 2 team Clay | $8.50 | ||
| June | 26 | 2 men 2 team To Balnice | $6.31 | ||
| Total | $31.31 | ||||
| EDWARD RINGMIER | $16.90 | ||||
| Apr. | 15 | 1 man 1 team 1 day Grading | $3.50 | ||
| June | 10 | 1 man 1 team 1/2 day Scraping | $2.00 | ||
| June | 11 | 1 man 1 team 3/4 day Scraping | $2.90 | ||
| June | 12 | 1 man 1 day on Bridge | $1.50 | ||
| June | 28 | 2 men 2 team 1 day Grading | $7.00 | ||
| Total | $16.90 | ||||
| JOSEPH GOKEY | $14.30 | ||||
| June | 11 | 1 man 1 team 1 day G??? | $3.50 | ||
| June | 12 | 3 men 2 team 1 day Gravel | $8.50 | ||
| June | 16 | 2 man 1 team 1/2 day Scraping | $2.30 | ||
| Total | $14.30 | ||||
| WM. SCHMOOCK | $15.33 | ||||
| June | 12 | 2 men 1 team 1 day Gravel | $5.00 | ||
| June | 14 | 2 men 1 team 1/2 day Gravel | $2.50 | ||
| Nov. | 26 | 1 man 1 team 3/4 Grading | $2.75 | ||
| From 1912 repairing Road | $2.00 | ||||
| Dec. | 1 | 3 Load Gravel to Balnice | $3.18 | ||
| Total | $15.33 | ||||
| Total | $94.74 | $94.74 |
1913 - Page 82
| Month | Day | Name | Tax | Total |
| Over Work | ||||
| June | 9 | 1 man 1 day | $2.00 | |
| June | 10 | 1 man 1 day | $2.00 | |
| June | 11 | 1 man 1 day | $2.00 | |
| June | 12 | 1 man 1 day | $2.00 | |
| June | 13 | 1 man 1 day | $2.00 | |
| June | 14 | 1 man 1 day | $2.00 | |
| June | 16 | 1 man 1 day | $2.00 | |
| June | 17 | 1 man 1 day | $2.00 | |
| June | 18 | 1 man 1 day | $2.00 | |
| June | 19 | 1 man 1 day | $2.00 | |
| June | 24 | 1 man 1 day | $2.00 | |
| June | 26 | 1 man 1 day | $2.00 | |
| June | 27 | 1 man 1 day | $1.25 | |
| Total | $25.25 | |||
| Apr. | 2 | Bridge repair by ZLAB F | $1.25 | |
| Apr. | 3 | 3 Rod North of JOHN KRIZIZKE | $0.75 | |
| Apr. | 3 | West of J. FUNK | $0.50 | |
| Apr. | 4 | 1/2 Mile West of J FRANK New B | $2.50 | |
| Apr. | 10 | School Road | $0.75 | |
| Apr. | 10 | West of ED GUETSCHOW | $0.50 | |
| Apr. | 11 | North of F STRUTZ 3 place | $1.25 | |
| Apr. | 12 | West of ED GUETSCHOW 4 place | $2.00 | |
| May | 6 | North School Scraping 1 man team | $1.25 | |
| May | 27 | Lake Shore Road | $0.50 | |
| May | 31 | 10 Rod West of ED. GUETSCHOW | $0.75 | |
| July | 30 | 20 Acre South of G. SHEPPER Lode Stone | $0.75 | |
| Aug. | 12 | 6 Rods North J. ZIK | $1.00 | |
| Sept. | 5 | North of JOHN KOMROSKY | $0.85 | |
| Oct. | 11 | 40 Ac North P DOSE new Bridge | $2.00 | |
| Oct. | 15 | 10 Acr West of L. FRASCH | $1.75 | |
| Oct. | 18 | 10 Acr West of L. FRASCH New Bridge | $3.00 | |
| Oct. | 22 | 1 day opening Scrping | $0.50 | |
| Dec. | 2 | 10 Rods East of P. Wisnifsky | $1.75 | |
| 12 x 2 G??? 10. Spike 23 nails L 4 | $0.47 | |||
| Total | $24.07 | |||
| Total | $49.32 |
1913 - Page 83
| Name | Tax Refund |
| Return JOSEPH LAFOND Pade | $0.71 |
| Gravel | |
| CHAS LECLAIR Load 392 | |
| ANTON HALLA Load 122 | |
| WM. RETZALFF | |
| CHAS SCHRODER | |
| Settled in full up to date with | |
| JOE. ZIK (Path Master) | |
| Dated this 2nd day of Dec. 1915 | |
| Town Board of Audit | |
| AUGUST LAST | |
| WALTER IHLENFELDT | |
| IGNATZ BLAHA |

1914 - Page 84
| Month | Day | Name | Tax | Expenditures | Total |
| WM. RETZLAFF JR | $6.24 | ||||
| June | 22 | 2 man 2 tine 1 day Gravel | $6.24 | ||
| ANTON HALLA | $17.55 | ||||
| June | 1 | 1 man 1 tine 1 day Scrapping | $3.50 | ||
| June | 12 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 16 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 23 | 1 man 1 tine 3/4 day Scrapping | $3.00 | ||
| June | 26 | to Blance | $0.55 | ||
| Total | $17.55 | ||||
| ALBERT GEERDTS | $20.12 | ||||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 16 | 1 man 1 tine 1/2 day Gravel | $1.75 | ||
| June | 17 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 18 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 20 | 1 man 1 tine 1/2 day Gr | $2.00 | ||
| Sept. | 21 | 1 man 1/2 day on Bridge | $0.85 | ||
| Sept. | 22 | 2 man 1 tine 1 day on Bridge | $5.02 | ||
| Total | $20.12 | ||||
| JOHN KOCH | $10.65 | ||||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 14 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 16 | 1 man 1 day | $1.50 | ||
| June | 11 | 1 man 1 tine to Blance | $2.15 | ||
| Total | $10.61 | ||||
| FRED STRUTZ | $9.18 | ||||
| 11 | 1man 1 tine Gravel | $1.50 | |||
| June | 13 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day | $3.50 | ||
| June | 16 | 1 man to Blance Gravel | $1.13 | ||
| Total | $9.18 | ||||
| Total | $64.24 | $64.24 |
1914 - Page 85
| Month | Day | Name | Tax | Expenditures | Total |
| HENRY TAYTER | $20.26 | ||||
| June | 12 | 2 man 1 tine Gravel | $5.00 | ||
| June | 13 | 2 man 1 tine Gravel | $4.00 | ||
| June | 15 | 2 man 1 tine Gravel | $5.00 | ||
| June | 17 | 2 man 1 tine Gravel | $5.10 | ||
| June | 22 | 1 man To Blance | $1.26 | ||
| Total | $20.16 | ||||
| GEORGE TAYTER | $31.42 | ||||
| June | 13 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 16 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 19 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 18 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 20 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 22 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 25 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| July | 7 | 2 man 1 tine Schreping on B | $3.42 | ||
| Total | $31.42 | ||||
| CHAS. SCHROEDER | $5.65 | ||||
| June | 19 | 1 man 1 tine 5 hours | $2.00 | ||
| June | 26 | 1 man 1 tine 1/2 day | $1.75 | ||
| June | 29 | 5 Lode of Grivel | $1.90 | ||
| Total | $5.65 | ||||
| FRANK RETZLAFF | $12.34 | ||||
| June | 18 | 1 man 1 tine 1/2 day | $1.75 | ||
| June | 19 | 1 man 1 tine hours | $4.00 | ||
| June | 20 | 1 man 1 tine hours | $4.00 | ||
| June | 25 | 1 man 1 tine 1/2 day Shivel | $1.75 | ||
| June | 30 | To blance | $0.84 | ||
| Total | $12.34 | ||||
| Total | $69.67 | $69.67 |
1914 - Page 86
| Month | Day | Name | Tax | Expenditures | Total |
| HERMAN MERYER | $21.48 | ||||
| June | 15 | 1 man 1 tine 1 day Grading | $3.50 | ||
| June | 16 | 1 man 1 tine 1 day Graval | $3.50 | ||
| June | 17 | 1 man 1 tine 1 day Graval | $3.50 | ||
| June | 18 | 1 man 1 tine 1 day Graval | $3.50 | ||
| June | 20 | 1 man 1 tine 1 day Graval | $3.50 | ||
| June | 24 | 1 man 1 tine 1 day Graval | $3.50 | ||
| July | 18 | 1 man to Blance on Bridge | $0.48 | ||
| Total | $21.48 | ||||
| June | FRED JONAS | $14.94 | |||
| June | 16 | 1 man 1/2 day | $0.75 | ||
| June | 17 | 2 man 1 day | $3.00 | ||
| June | 18 | 1 man 1 day | $1.50 | ||
| June | 19 | 1 man 1 day 1 poly | $2.50 | ||
| June | 20 | 1 man 1 day | $1.50 | ||
| June | 25 | 2 man 1 day Gravel | $3.00 | ||
| June | 26 | 1 man 1 tine Gravel to blance | $2.69 | ||
| Total | $14.94 | ||||
| ADATPH GRIMM | $28.77 | ||||
| June | 12 | 2 man 2 tine 1/2 day Gravel | $3.50 | ||
| June | 13 | 2 man 2 tine 1 day Gravel | $7.00 | ||
| June | 15 | 3 man 3 time 1 day | $10.50 | ||
| June | 17 | 2 man 2 tine 1 day Gravel | $7.00 | ||
| 1 man on Bridge Gravel 13 | $0.77 | ||||
| Total | $28.77 | ||||
| ERNST DUVEICK | $21.24 | ||||
| Apr. | 22 | 1 man 1 tine 1 day Grading | $3.50 | ||
| June | 11 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 16 | 2 Lode (?) 3 Lode Same Clay holl on B | $3.50 | ||
| June | 17 | to Blance | $0.24 | ||
| Total | $21.24 | ||||
| Total | $86.43 | $86.43 |
1914 - Page 87
| Month | Day | Name | Tax | Expenditures | Total |
| HEN. SCHMOOCK | $14.64 | ||||
| June | 19 | 1 man 1 tine 1 day load stone | $3.50 | ||
| June | 20 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| July | 7 | holl Man B Cement | $3.50 | ||
| Oct. | 16 | 1 man 3/4 day on Bridge | $1.14 | ||
| Oct. | 19 | 1 man 1 day on Bridge | $1.50 | ||
| Total | $14.64 | ||||
| FRANK RE??ISE | $12.82 | ||||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 17 | 1 man 1 tine 1 day holl Stone | $3.50 | ||
| June | 18 | 1 man 1 tine 1 day holl Stone | $3.50 | ||
| June | 19 | 1 man 1 tine to Bance | $2.32 | ||
| Total | $12.82 | ||||
| ALBART WODWASHEK | $12.60 | ||||
| Apr. | 21 | 1 man 1 tine 1/2 day Grading | $1.75 | ||
| Apr. | 22 | 1 man 1 tine 1/2 day Grading | $1.75 | ||
| June | 17 | 1 man 1 tine Scrapping 1 day | $3.50 | ||
| June | 18 | 1 man Scrapping | $3.50 | ||
| Oct. | 19 | 1 man 12 hours on B. | $2.10 | ||
| Total | $12.60 | ||||
| MARTIN KONORSKI | $32.29 | ||||
| Apr. | 22 | 1 man 1 tine 1 day Grading | $3.50 | ||
| June | 1 | 1 man 1 tine 3/4 day Gravel | $2.50 | ||
| June | 11 | 3 man 2 tine 1 day Gravel | $8.50 | ||
| June | 12 | 3 man 2 tine 1 day Gravel | $8.50 | ||
| June | 13 | 3 man 2 tine 1 day Gravel | $8.50 | ||
| June | 20 | 1 man to Blance | $0.79 | ||
| Total | $32.29 | ||||
| AUGST KLINDER | $16.45 | ||||
| June | 11 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 12 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 17 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 18 | 1 man to Banlce | $2.45 | ||
| Total | $16.45 | ||||
| Total | $88.80 | $88.80 |
1914 - Page 88
| Month | Day | Name | Tax | Expenditures | Total |
| JOE KRIZEK | $12.18 | ||||
| 18 | 1 man 1 tine 1 day Gravel | $3.50 | |||
| June | 19 | 1 man 1 tine 1 day Scrpping | $3.50 | ||
| June | 20 | 1 man 1 tine 1 day Scrapping | $3.50 | ||
| June | 23 | 1 man 1 tine 1 day to Baline | $1.68 | ||
| Total | $12.18 | ||||
| ANTON KRIZEK | $11.65 | ||||
| June | 19 | 1 man 1 tine 3/4 day Gv. | $2.50 | ||
| June | 20 | 1 man 1 tine 1 day Gv. | $3.50 | ||
| June | 23 | 1 man 1 tine 1 day Gv. | $3.50 | ||
| June | 24 | 1 man 1 tine to Blance | $2.15 | ||
| Total | $11.65 | ||||
| AUGST LEST | $5.45 | ||||
| June | 26 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| Nov. | 28 | To Balane | $1.95 | ||
| Total | $5.45 | ||||
| WM. SCHRAMM | $5.18 | ||||
| June | 20 | 2 man 1 tine 1 day Scrapping | $5.18 | ||
| JOHN KOMORSKI | $21.41 | ||||
| June | 11 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 15 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 16 | 2 man 1 tine 1/2 day Gravel | $3.00 | ||
| June | 17 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| Oct. | 13 | 1 man on Brige 1 day | $1.41 | ||
| Total | $21.41 | ||||
| EDWARD GUETSCHOW | $17.31 | ||||
| June | 11 | 2 Lode Gravel | $1.25 | ||
| June | 13 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 15 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 16 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| July | 7 | 1 man on Brige 10 hours | $2.00 | ||
| Oct. | 15 | 1 man on Brige 1/2 day | $0.75 | ||
| Oct. | 19 | 1 man on Brige 1 day | $1.31 | ||
| Total | $17.31 | ||||
| Total | $73.18 |
1914 - Page 89
| Month | Day | Name | Tax | Expenditures | Total |
| FRANK KRIZIZKE | $20.61 | ||||
| 10 | 1 man 1 tine 3/4 day Grading | $2.50 | |||
| June | 12 | 1 man 1 tine 1 day Graded | $3.00 | ||
| June | 13 | 1 man 1 tine 1 day Graded | $3.00 | ||
| June | 15 | 2 man 1 tine 1 day Graded | $5.00 | ||
| June | 16 | 1 man 1 tine 1 day Graded | $3.50 | ||
| Oct. | 12 | 1 man 1/2 day on Brige | $0.71 | ||
| Oct. | 15 | 1 man 1 day on Brige | $1.50 | ||
| Oct. | 22 | 1 man to Blince | $1.40 | ||
| Total | $20.61 | ||||
| JOE ZIK | $18.11 | ||||
| Apr. | 14 | 1 man 1 tine 1 day Grading | $3.50 | ||
| Oct. | 16 | holling engine Concereat ??er | $3.50 | ||
| Oct. | 19 | 1 man 1 tine 1 day Scrpping on B | $3.50 | ||
| Aug. | 29 | Holling 10 B Ceamnet for Bollring | $2.61 | ||
| Nov. | 27 | 2 man 1 tine 1 day Grading | $5.00 | ||
| Total | $18.11 | ||||
| MRS. JACOB FUNK | $4.05 | ||||
| June | 13 | 1 man 1 tine 1 Lod Gravel | $1.00 | ||
| June | 15 | 1 man 1 tine 2 Lod Gravel | $2.00 | ||
| June | 16 | 1 man 1 tine 2 Lod Gravel | $1.05 | ||
| Total | $4.05 | ||||
| WM SCHMIDT | $4.05 | ||||
| Oct. | 16 | 1 man 1 day on Brigde | $1.50 | ||
| Nov. | 3 | 1 man 1 tine Scapping Bridge | $2.55 | ||
| Total | $4.05 | ||||
| June | EMIL POUTA | $3.60 | |||
| June | 18 | 1 man 1 day | $1.50 | ||
| June | 19 | 1 man 1 day | $1.50 | ||
| 20 | 1 man to Banlce | $0.60 | |||
| Total | $3.60 | ||||
| AUGST POUTA | $3.78 | ||||
| June | 25 | 1 man 1 tine 1 day S????? | $3.00 | ||
| June | 26 | 1. Loud Grivel | $0.78 | ||
| Total | $3.78 | ||||
| Total | $54.20 | $54.20 |
1914 - Page 90
| Month | Day | Name | Tax | Expenditures | Total |
| WENZEL MEYER | $8.10 | ||||
| July | 28 | GUST EAGGER 2 man 2 tine 1/2 day Grading | $3.50 | ||
| Sept. | 11 | GUST EAGGER 2 man 2 tine 3/4 day Grading | $4.60 | ||
| Total | $8.10 | ||||
| JOHN BERTZINGER | $9.00 | ||||
| June | 19 | 2 man 1 tine 1/2 day SC | $2.50 | ||
| June | 20 | 2 man 1 tine 1/2 day SC | $5.00 | ||
| June | 22 | 1 man To Banlce 1 day | $1.50 | ||
| Total | $9.00 | ||||
| GUSTE EGGERT | $23.75 | ||||
| May | 26 | 1 man 1 tine 1/2 day Grading | $1.75 | ||
| June | 11 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 12 | 2 man 2 tine 1 day Gravel | $6.25 | ||
| June | 13 | 2 man 2 tine 1 day Gravel | $7.50 | ||
| June | 15 | 1 man 1 tine 1 day Gravel | $4.75 | ||
| Total | $23.75 | ||||
| FRANK BARTAL | $17.58 | ||||
| June | 13 | 2 Load Grivel | $1.58 | ||
| June | 17 | 1 man 1 tine 1 day G | $3.50 | ||
| June | 18 | 1 man 1 tine 1 day G | $3.50 | ||
| June | 19 | 1 man 1 tine 1 day Stone | $3.50 | ||
| June | 20 | 1 man 1 tine Stone on School R | $3.50 | ||
| July | 7 | 1 man 10 hours on Bridge | $2.00 | ||
| Total | $17.58 | ||||
| CHAS. RETZLAFF | $16.95 | ||||
| June | 13 | 1 man 1 tine 1 day Grivel | $3.50 | ||
| June | 15 | 4 Load | $4.00 | ||
| June | 16 | 1man 1 tine 1 day Grivel | $3.50 | ||
| June | 17 | 2 man 1 tine 1 day Grivel | $5.00 | ||
| Oct. | 16 | 1 man on new Bridge | $0.95 | ||
| Total | $16.95 | ||||
| Total | $75.38 | $75.38 |
1914 - Page 91
| Month | Day | Name | Tax | Expenditures | Total |
| MRS FRANK RETZLAFF | $17.66 | ||||
| June | 12 | 1 man 1 tine 1 day Grading | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day 1 Grivel | $3.50 | ||
| June | 17 | 1 man 1 tine 1 day 1 Grivel | $3.50 | ||
| June | 20 | 4 Load | $4.00 | ||
| Oct. | 27 | 1 man 1 tine Grading | $3.16 | ||
| Total | $17.66 | ||||
| JOHN KRIZIZKE | $14.01 | ||||
| June | 15 | 1 man 1 tine 1 day Grivel | $3.50 | ||
| June | 19 | 1 man 10 hours on School Rd | $2.00 | ||
| July | 6 | 1 man 1 day on New Bridge | $1.50 | ||
| Oct. | 12 | 1 man 1 tine 3 Loat Grivel | $3.00 | ||
| Oct. | 15 | 1 man 1 day on Bridge | $1.51 | ||
| Oct. | 19 | 1 man 1 day engine 1/2 day | $2.50 | ||
| Total | $14.01 | ||||
| Apr. | GEORGE SHEPPER | $16.87 | |||
| May | 14 | 2 man 1 tine 1 day Grading | $5.00 | ||
| June | 26 | 1 man 1/2 day | $0.75 | ||
| June | 10 | 1 man 1 tine 3/4 day Grading | $2.50 | ||
| June | 12 | 2 man 1 tine 1 day Grivel | $4.25 | ||
| June | 13 | 1 man 1 tine 1 day Grivel | $3.50 | ||
| Oct. | 15 | 1 man on New Bridge | $0.87 | ||
| Total | $16.87 | ||||
| PETER WISFINSKY | $17.37 | ||||
| Apr. | 14 | 1 man 1 tine 1/2 day Grading | $1.75 | ||
| June | 11 | 1 man 1 tine 1 day Grivel | $3.50 | ||
| June | 12 | 1 man 1 tine 1 day Grivel | $3.50 | ||
| June | 13 | 1 man 1 tine 1 day Grivel | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day Grivel | $3.50 | ||
| June | 18 | 1 man To Blince | $1.62 | ||
| Total | $17.37 | ||||
| Total | $65.91 | $65.91 |
1914 - Page 92
| Month | Day | Name | Tax | Expenditures | Total |
| LOUIS FRASCH | $16.19 | ||||
| June | 18 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 20 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 22 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 24 | 1 man 1 day Grading | $1.19 | ||
| Total | $16.19 | ||||
| GEORGE GOKY | $13.77 | ||||
| June | 12 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 18 | 1 man 1 tine 1 day Gravel | $3.27 | ||
| June | 20 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| Total | $13.77 | ||||
| PETER DOSE | $18.00 | ||||
| June | 16 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 17 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 18 | 2 man 1 tine 1 day Gravel | $5.00 | ||
| June | 19 | 1 man 1 tine 1 day Gravel | $3.00 | ||
| Total | $18.00 | ||||
| CHAS LECLAIR | $29.08 | ||||
| June | 23 | 2 man 2 tine 1 day Grading | $7.00 | ||
| June | 24 | 2 man 2 tine 1 day Grading | $7.00 | ||
| June | 25 | 2 man 2 tine 1 day Grivel | $7.00 | ||
| June | 26 | 2 man 2 tine 1 day Grivel | $7.08 | ||
| July | 7 | 1 man 1 tine Bridg 1 day | $1.00 | ||
| Total | $29.08 | ||||
| JOSEPH GOKY | $15.77 | ||||
| June | 12 | 2 man 1 tine 1/2 day Scrapping | $2.50 | ||
| June | 13 | 2 man 1 tine 1 day Scrapping | $5.00 | ||
| June | 15 | 2 man 1 tine 1 day Grivel | $5.00 | ||
| June | 16 | 1 man 1 tine To Blanec | $3.27 | ||
| Total | $15.77 | ||||
| Total | $92.81 | $92.81 |
1914 - Page 93
| Month | Day | Name | Tax | Expenditures | Total |
| EDWARD RINGMYER | $17.26 | ||||
| June | 11 | 3 Load Gravel | $3.20 | ||
| June | 12 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 13 | 1 man 1 tine 1 day Gravel | $3.50 | ||
| June | 15 | 1 man 1 tine 1 day Grading | $3.50 | ||
| June | 16 | 1 man 1 tine 1 day Grading | $3.56 | ||
| Total | $17.26 | ||||
| RUDOLPH HALLADA | $1.32 | ||||
| Apr. | 21 | 1 man 1 tine part day Grad. | $1.32 | ||
| June | 25 | NOMUMER LECLAR | $0.17 | $0.17 | |
| June | 15 | CHRAS KLINDER | $0.17 | $0.17 | |
| June | 15 | JOHN KORMORSKI JR | $0.17 | $0.17 | |
| July | 14 | OSCAR TAYLER | $0.17 | $0.17 | |
| Total | $19.26 | $19.26 | |||
| JOE ZIK Over Work | |||||
| June | 10 | order Man 1 1/2 day | $1.00 | ||
| June | 11 | Oardering man 1 day | $2.00 | ||
| June | 12 | 1 day | $2.00 | ||
| June | 13 | 1 man day | $2.00 | ||
| June | 15 | 1 man 1 day | $2.00 | ||
| June | 17 | 1/2 day | $1.00 | ||
| June | 18 | 1 man 1 day | $2.00 | ||
| June | 19 | 1 man 1 day | $2.00 | ||
| June | 20 | 1 man 1 day | $2.00 | ||
| June | 22 | 1 man 1/2 day | $1.00 | ||
| June | 23 | 1 man 1 day | $2.00 | ||
| June | 24 | 1 man 1 day | $2.00 | ||
| June | 25 | 1 man 1 day | $2.00 | ||
| June | 26 | 1 man 1/2 day | $1.00 | ||
| June | 16 | 1 man 1 day | $2.00 | ||
| May | 23 | 3/4 of day Grading | $1.50 | ||
| May | 26 | 1 man 1 tine 1/2 day Grading | $2.25 | ||
| Sept. | 11 | part of day Grading | $1.25 | ||
| July | 28 | 1 man 1/2 day Grading | $1.00 | ||
| Total | $32.00 |
1914 - Page 94
| Month | Day | Name | Expenditures |
| Bridge Work | |||
| Apr. | 17 | 20 Rods East E Ringmier | $0.50 |
| June | 9 | 20 Rods East 9 #16 pil | $1.50 |
| July | 6 | 10 Rods West G. TAYTR new B | $2.00 |
| July | 7 | 1 man 1 tine 1 day on new Bridg | $3.50 |
| July | 18 | 1 man 1 tine Hold 1000 feet plinks S MI?? | $1.75 |
| Sept. | 1 | 8 RODS North AL GEERDTS B | $2.00 |
| Sept. | 3 | 8 RODS North AL GEERDTS B | $1.50 |
| Oct. | 15 | 1/2 mile West Mrs. J FRASCH New B | $2.00 |
| Oct. | 20 | 20 Acr South E GOWATOW 10# 18P | $2.50 |
| Oct. | 22 | 1/2 DAY ON New Bridge | $1.00 |
| June | 8 | 4 Rod South Ma KOMESKY 9# 20p | $1.50 |
| June | 8 | 20 Acr East J FUNK 9# 20 pie | $1.50 |
| Nov. | 3 | 3 Rods South J GOKY Scrapping time | $1.75 |
| Nov. | 7 | 1/2 Mile West J FUNK Scrapping on Brige | $1.75 |
| 5 post 8# 6 ?rm E RINGMEIR | $1.00 | ||
| Oct. | 19 | 5 Gallon Gasoline | $0.45 |
| Nile | $0.10 | ||
| Light on Bridge | $0.75 | ||
| Total | $27.05 | ||
| $32.00 | |||
| Total | $59.05 | ||
| Load Grivel 1914 | |||
| JOHN KOCK 13 Lodes | |||
| ANTON HALLA 417 Lodes | |||
| CHAR SCHRODER 5 Lodes | |||
| WM. RETZLAFF 2 Lodes | |||
| Snow |